This equipment is used for cleaning all kinds of turnover baskets. The whole machine is made of high-quality 304 stainless steel to meet the national health requirements. The pipeline adopts a snap-in installation form, which is convenient for pipeline cleaning and reliable operation. Using multi-stage pump pressure supply, unique nozzle installation makes cleaning more thorough.
Spray system:
1). Conical cleaning nozzle arrangement for stereo four-way mounting structure, a scattered distribution, nozzle angle adjustable, cold, hot water cleaning, the cleaning is more thorough, all the pipes and joints are the quick change connector design, each nozzle pipe can achieve without dismounting tool, easy to clean, workers per shift cleaning without dead angle, cleaning the box without dead angle;
2). Tank before the second stage adopts horizontal spray cleaning stainless steel centrifugal pump cycle, water pump using the best domestic pump pump industry (per 7.5 KW), southern water pump flow per hour 100 cubic, big flow pump small export, pressure big, clean the cleaner. In the first two paragraphs of water temperature 30-50 degrees self-control, after a period of ordinary water pump (each 3 kw), water spray system, to ensure the cleaning effect of ideal
Working principal:
Steam is injected to water directly for heating; the spraying nozzles are used in all directions, so crates can be cleaned from different directions; there are three washing sections, 1st section by spraying alkali solution, cleaning temperature 80 degrees; 2nd section by spraying hot water, temperature 80 degrees; 3rd by normal water cleaning and meanwhile cool the crates before output;
Name
|
Section
|
Two Sections
|
There Sections
|
Five Sections
|
Length/Width/Heigh
|
2900*1700*1700
|
4500*1700*1700
|
6100*1700*1700
|
8900*1700*1700
|
Machine plate
|
SUS304
|
Power supply
|
380V/50HZ
|
Total power
|
9
|
16.5
|
19.5
|
34.5
|
Steam consumption
|
0.3T/H
|
Water supply pressure
|
4KG
|
Thickness
|
3mm
|
Steam pressure Mpa
|
0.6Mpa
|
Electric heating
|
15kw/per
|
Workload
|
100-500units
|
300-800units
|
800-1200units
|
1000-1500units
|
Working height
|
1000mm
|
Water consumption
|
0.5m*3/one tank
|
The target enter into the machine from the stainless steel chain, sequentially through the warm water to high pressure hot water to room temperature water to disinfection water and then remove the water from the powerful fan. Sterilization and blow dry at the same time when the target is cleaned up fully. For hard cleaning, the hot soda water can be added and plus several brushes, focus on the bottom and two sides of the target, using continuous cleaning mode to improve the clean up effect.
China GUANHAOMachinery and Equipment Limited is a professional manufacturer of food processing machines and high pressure cleaning equipment.
We are a comprehensive enterprise which integrates research,development,manufacture,installation and
maintenance.We have advanced equipment,rich experience,highly-qualified scientific researchers and professional staff members for the after-sales service.
We specialized in designing and producing fruit and vegetable processing line which is including fruit and vegetable washing machine,drying machine,peeling machine,slicing machine,chopping machine,sorting machine,mixing machine,and potato chips production line,meat processing line and high pressure cleaning pump,hydro test pump etc.
Our products had been exported to more than 60 countries,all the products had been gained high praise from the customers at home and abroad.
We will continue to follow the policy of "quality first,reputation first,customer first".And sincerely hope to cooperate with much more customers all over the world.
1. What can we offer you?
Food machinery and various solutions
2. What are our packing conditions?
We package the goods with film winding and plywood.
3. How can we guarantee the quality?
Our goods are 100% inspected before loading.
4. Why do you buy from us instead of other suppliers?
30 years of food processing experience, each machine processing high quality, advanced machining
technology, and good after-sales service.
5. How long is the delivery time of our equipment?
Generally speaking, 30-35 days after receiving the deposit, the specific delivery time depends on the quantity of goods and your order.
6. What are our terms of payment?
50% by telegraphic transfer as a deposit, and 50% before delivery can be negotiated according to the actual situation